Case Studies
Focus Networks has helped its clients increase system stability and reliability, minimize regulatory/compliance risks and strengthen
business continuity.
97
%Of Customers Are Satisfied
13
secsTelephone Call Waiting Time
41
minsTime Taken To Fix Each Issue
Shire of Beverley
Business continuity for all the IT systems needed to be defined and tested. Focus Networks were engaged to refresh the IT DR Plan and undertake a disaster recovery simulation. The Project Implementation service was activated.
Richgro
Being heavily reliant on our IT systems, the decision was made to adopt a solution that would minimise our risk profile. Requirements included backup and archive features along with an annual disaster recovery test.
HLB Mann Judd
Specific server infrastructure had become end of life and required upgrading. The business decided on an opex (ongoing monthly cost) solution to avoid a capex (large upfront cost) solution. The Managed Infrastructure Service was implemented.
Shire of York
Multiple sites needed to be securely connected back into the head office network. Focus Networks were engaged to design, implement and support the new secure network. The Managed Firewall Service was implemented.
City of Vincent
With an already busy IT team and a heavy roadmap of upcoming project works, a decision was made to introduce scalable operational support to augment internal staff resources. Focus Networks were engaged through the CUA.
ESM Strata
Connected businesses over East and overseas needed an easier way to access our resources and we wanted this access to be extremely secure. Redundant Internet links would also increase Internet uptime.
Town of East Fremantle
IT requirements for the business are delivered through an external contractor. Two internal resources manage the relationship. Focus Networks were acquired through the CUA panel for desktop, server and network skills.
Clontarf Foundation
Clontarf Foundation had outgrown their current IT provider and so a change was required to be made. Of highest concern to senior management, was the continuation of IT support across Australia whilst an IT handover was completed.